Studio EAST

Show Navigation
  • Portfolio
  • About
  • Instant Quotation
  • Contact
  • Videos
  • Instagram
  • Galleries
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
Info
  • Facebook
  • Twitter
x

Loading of OBGs for Self-Anchored Suspension bridge

OBGs including 5AW (first on left) and 5AE (first on right) stand on the trial assembly on Changxing Island, Shanghai, on December 20, 2009. Photo by Lucas Schifres/Pictobank

Add to Cart Add to Lightbox Download
Filename
091220 Bay Bridge China 60.jpg
Copyright
Pictobank
Image Size
3504x2336 / 2.8MB
Asia China Shanghai Industry Factory Construction Production Bridge Transportation Plant Steel
Contained in galleries
OBGs including 5AW (first on left) and 5AE (first on right) stand on the trial assembly on Changxing Island, Shanghai, on December 20, 2009. Photo by Lucas Schifres/Pictobank